Stacked 100% barchart from multiple measures?

My data looks like this:

Date Batch Number Total Downtime Down For Cleaning Down For Part Change Down For Maintenance Down For Transportation
Sept 1 1111 5 0 4 1 0
Sept 2 2222 7.5 1 0 6 0.5
Sept 3 3333 1 0.5 0.25 0.25 0
Sept 3 4444 4 0 2 1 1

I want to create a stacked 100% bar chart to display the breakdown % out of the total downtime by batch or by date. How can I do this?

@Ali_B what’s the difficulty?

I used the 100% Stacked bar chart which supports only one measure. I tried with regular bar stacked barchart and it seems to be working. I hope this is the right way to do it.

1 Like