Creating a control to switch the time breakdown in a visualization

Hi all,

I have a standard, run of the mill combo bar/line chart.

I know I can configure the x axis according to the time breakdown I would like to have (ie. month/week/day…). But I am interested in the possibility of having a control in which I could select which time breakdown I would like the graph to be.

I am guessing this is not something I can achieve with standard drag and drop Quicksight functionality, but can anything be done using parameters or any other stuff?

Thanks in advance.

Juan

Hi @Juan_Badal

Can you please check the below post and see if it helps to change the visual granularity by using filter controls.

Thanks
VInod

Will do, Vinod! Thanks for the prompt response.
Juan