Hi, you can create a calculated field in data prep phase, and when you add a parameter in analysis, you can link the parameter with the calculated field. Curently calculated field created in analysis are not available to be linked by a parameter.
Related topics
| Topic | Replies | Views | Activity | |
|---|---|---|---|---|
| Parameter Values linked to Calculated Field | 2 | 181 | March 15, 2024 | |
| How to use a calculated field in a control? | 2 | 2663 | January 8, 2024 | |
| Parameters in data preparation phase? | 4 | 712 | March 16, 2022 | |
| Parameter for Calculated field | 4 | 582 | November 28, 2023 | |
| Pass value of calculated field/KPI visual to parameter for conditional formatting | 1 | 938 | September 13, 2022 |